4 Days Mount Kenya — Sirimon Route
Mountain Climbing · Mount Kenya · Kenya

Mount Kenya Sirimon Route — 4 Days

Duration: 4 DaysMountain: 5,199m — Point Lenana (trekking summit)Route: Sirimon RouteBest Time: Jan–Feb / Jul–Sep
Duration4 Days
RouteSirimon
SummitPoint Lenana (4,985m)
UNESCOWorld Heritage Site
Enquire Now →

Overview

Mount Kenya is the second highest mountain in Africa and a UNESCO World Heritage Site — a dramatic volcanic massif rising from the equatorial plains to a jagged series of rocky peaks. The highest trekking point, Point Lenana (4,985m), is accessible to fit, non-technical trekkers and offers extraordinary views of the dramatic central peaks of Batian and Nelion.

The Sirimon Route is the most gradual and well-graded ascent on Mount Kenya — approaching from the northwest through bamboo forest, open moorland and spectacular Afro-alpine vegetation unique to equatorial African mountains. Giant lobelias, groundsels and heathers create a landscape unlike anywhere else on earth. Wildlife on the mountain includes elephant, buffalo, lion, colobus monkey and the rare bongo antelope.

Your Route

NairobiDay 1 — Departure
Sirimon Gate (2,650m)Day 1 — Entry
Old Moses Camp (3,300m)Night 1
Shipton's Camp (4,200m)Night 2
Point Lenana (4,985m)Day 3 — Summit!
Nanyuki / NairobiNight 3
Nairobi/JKIADay 4

Day by Day Itinerary

01
Nairobi → Sirimon Gate — Acclimatisation
Nairobi · Mount Kenya National Park
+

Drive from Nairobi to the Sirimon Gate (2,650m) — approximately 3.5 hours through the Mount Kenya foothills. Trek to Old Moses Camp for acclimatisation.

  • Nairobi to Sirimon Gate drive (3.5hrs)
  • Trek Sirimon Gate to Old Moses Camp (2hrs)
  • Arrive Old Moses Camp (3,300m)
  • Briefing on mountain environment and acclimatisation
🏕 Accommodation: Old Moses Camp (3,300m) — self-contained banda/tent
02
Old Moses → Shipton's Camp
Acclimatisation Day — 3,300m to 4,200m · 12km · 6hrs
+

The most dramatic day on the mountain. Ascend through open moorland with giant lobelias and groundsels lining the valley. The Mackinder's Valley opens ahead revealing the jagged central peaks. Arrive at Shipton's Camp beneath the dramatic rocky summit towers.

  • Trek through moorland and Afro-alpine zone
  • Giant lobelias and groundsels — unique flora
  • Elephant and buffalo possible en route
  • Arrive Shipton's Camp (4,200m)
  • Acclimatisation walk to Harris Tarn (4,400m)
🏕 Accommodation: Shipton's Camp (4,200m) — bunkhouse
03
Summit — Point Lenana (4,985m) — Descent
Summit Day · Start 03:00am
+

Depart at 3:00am in the dark for the summit push to Point Lenana. The trail climbs through scree and frozen ground to the glacier edge and then to the summit — arriving at dawn for a sunrise view over the roof of Kenya and, on clear days, all the way to Kilimanjaro on the southern horizon. Descend via the Naro Moru route to Met Station.

  • 3:00am departure for Point Lenana
  • Arrive Point Lenana (4,985m) at dawn
  • Sunrise over Kenya — Kilimanjaro visible on clear days
  • Descend via Naro Moru route
  • Arrive Met Station (3,000m)
  • Drive to Nairobi or Nanyuki overnight
🏕 Accommodation: Nanyuki mountain lodge or Nairobi hotel
04
Return Nairobi — Departure
Nairobi, Kenya
+

Drive back to Nairobi. Rest day or JKIA departure.

  • Nanyuki or Met Station to Nairobi drive
  • Optional Mount Kenya Safari Club visit
  • JKIA departure transfer
🏕 Accommodation: Day of departure

What's Included

Included

  • All accommodation — Nairobi hotel (1 night) and mountain camps/huts
  • All meals on the mountain
  • KWS-certified head guide and assistant guides
  • Professional porters
  • All Mount Kenya National Park fees
  • Nairobi–Sirimon Gate–Nairobi transfers

Excluded

  • International flights
  • Kenya eTA (~$30)
  • Personal trekking gear (full list on booking)
  • Travel insurance including altitude evacuation (mandatory)
  • Gratuities for guide and porters
  • Personal items